Construction Cooling Tunnel AC Unit

Product Details
Customization: Available
Material: Carbon Steel with Painting
Usage: for Air Conditioner
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 4 Self-brands, check the Audit Report for more information
National Award received
This supplier had received national award, you can check the Audit Report for more information
to see all verified strength labels (28)
  • Construction Cooling Tunnel AC Unit
  • Construction Cooling Tunnel AC Unit
  • Construction Cooling Tunnel AC Unit
  • Construction Cooling Tunnel AC Unit
  • Construction Cooling Tunnel AC Unit
  • Construction Cooling Tunnel AC Unit
Find Similar Products
  • Overview
  • Product Description
  • Company Profile
Overview

Basic Info.

Flow Direction
Cross Flow
Pressure
Medium Pressure
Certification
ISO, CE
Application
Metro/Subway/Railway Construction
Matched Shield Machine
Epb, Slurry Balanced, Tbm
Transport Package
Wooden Box
Specification
Customized
Trademark
Tranp
Origin
China
HS Code
8415821000
Production Capacity
1000/Year

Packaging & Delivery

Package Size
100.00cm * 120.00cm * 100.00cm
Package Gross Weight
3000.000kg

Product Description

Construction Cooling Tunnel AC Unit 

Introduction
 
Product Description

The air conditioning system developed by our company uses a combination of external circulation cooling water cooling of the shield machine and pressurization of the cooling air to cool the interval tunnel working area. On the basis of traditional external circulation cooling and tunnel ventilation, an air conditioning system is installed on the shield machine to cool the tunnel ventilation airflow before entering the secondary fan system, so that the cooling air is transported from the exit of the secondary ventilation system to the construction site ( Tube assembly area). The temperature of the secondary fan air outlet can reach as low as 20 °C (this is the temperature that can be lowered when the temperature is high in the summer in Guangzhou, and the effect is better when the external temperature is lower), which is 10-12 °C lower than the maximum temperature at normal temperature, and the ventilation is up to 90000m³/h, enough to effectively cool the working area, and make the ambient temperature suitable for construction work.


Main composition

The advanced high-efficiency twin-screw compressor is matched with high-quality condenser and evaporator, and is produced by advanced processing technology and precise data calculation. The series of tunnel air-conditioning units have the characteristics of high cooling efficiency, large air-cooling processing capacity and fast cooling speed. It is a non-standard customized product that is professionally applied to tunnel air conditioning refrigeration systems.
Construction Cooling Tunnel AC Unit
Electric control system

It adopts SIEMENS integrated control, the reaction is sensitive and precise, and the operating state and real-time air temperature can be set according to seasonal demand. The unit has multiple functions such as automatic loading and unloading, time switching machine and recording the cause and time of failure, which can realize remote or central monitor.

Construction Cooling Tunnel AC Unit
Air cooling plant

The air cooling device of this series of tunnel air conditioning units is designed and  selected according to the air supply requirements of the secondary fan of the shield machine and the actual installation space of the shield machine. DN400/DN600/DN800/DN1000 product series with different air duct diameters can be customized, which is suitable for the air conditioning cooling requirements of various small shield machine and large shield machine. 

Construction Cooling Tunnel AC Unit
Product feature

Reliable

The unit adopts brand components such as Hanzhong compressor, Siemens PLC, Schneider electrical components, and Southern Water Pump to ensure the reliability of the unit.

Energy Saving

It adopts four levels of operation capacity (0, 25, 50, 75, 100%), and automatically adjusts the running load of the unit according to the real-time cooling demand, to meet different use requirements such as power saving, and distinction in autumn and winter seasons;

Smart

The system adopts PLC integrated control, which can be connected to the central control room of the shield machine for remote control. It can display compressor power,  flow rate and inlet/ outlet temperature of cooling water,  inlet and outlet temperature of air cooler, etc. in real time;

About Us
Company Profile

Construction Cooling Tunnel AC UnitConstruction Cooling Tunnel AC UnitConstruction Cooling Tunnel AC UnitConstruction Cooling Tunnel AC UnitConstruction Cooling Tunnel AC UnitConstruction Cooling Tunnel AC Unit




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now